【单选题】

In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (标准件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months. There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for these castings are situated all around the building. After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid. After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work. In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread. The main difference between panel method and the method discussed in the last paragraph is_______.

A.
the latter uses ready-made internal features
B.
panels are cast in a level position
C.
the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D.
the former is more expensive than the latter
题目标签:标准件
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
收藏 - 刷刷题收藏
举报
刷刷题
参考答案:
举一反三

【单选题】标准件对设备来说其最大的优点是()。

A.
价格便宜
B.
批量生产
C.
随处可以买到
D.
互换性

【单选题】In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building...

A.
the latter uses ready-made internal features
B.
panels are cast in a level position
C.
the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D.
the former is more expensive than the latter

【单选题】以下四种钻套( )不是标准件

A.
特殊钻套
B.
快换钻套
C.
固定钻套
D.
可换钻套
相关题目:
【单选题】标准件对设备来说其最大的优点是()。
A.
价格便宜
B.
批量生产
C.
随处可以买到
D.
互换性
【单选题】In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building...
A.
the latter uses ready-made internal features
B.
panels are cast in a level position
C.
the former is used to build walls and floors while the latter to construct bathrooms or bedrooms
D.
the former is more expensive than the latter
【单选题】以下四种钻套( )不是标准件
A.
特殊钻套
B.
快换钻套
C.
固定钻套
D.
可换钻套
刷刷题-刷题-导入试题 - 刷刷题
参考解析:
题目纠错 0
发布
刷刷题-刷题-导入试题 - 刷刷题刷刷题-刷题-导入试题 - 刷刷题刷刷题-刷题-导入试题 - 刷刷题
刷刷题-刷题-导入试题 - 刷刷题
刷刷题-刷题-导入试题 - 刷刷题
刷刷题-单词鸭