大学职业资格刷题搜题APP
下载APP
课程
题库模板
Word题库模板
Excel题库模板
PDF题库模板
医考护考模板
答案在末尾模板
答案分章节末尾模板
题库创建教程
创建题库
登录
logo - 刷刷题
创建自己的小题库
搜索
【单选题】

In some countries in which there is very little rain at any time, the farmers have to water their fields. Irrigation is easy enough if there is a great river near the crops and if there is plenty of water in it. Cs(运河) carry the river water to the fields when necessary. In some seasons there may be too much water in the river, and the water may flood all the land near it. At other times the river water may not be enough for all the farmers, and then it will be difficult to irrigate the fields. To pr these difficulties, a dam (大坝) may be built across the river. This will store water for dry seasons and in wet seasons it will pr the flooding of the land. A great lake will, no doubt, be formed behind the dam, and this may mean that houses and fields will be covered with water. Most people will accept that and will be ready to move to other places. Then the country can have the right amount of water at all times; more crops will be growing, there will be more food for everyone, and there will be no more floods. Dams have been built for centuries in different parts of the world. Modern dams are usually built of concrete(混凝土) ,but earth dams were used in India and Sri Lanka about 2,500 years ago. There was another across the River Tigris very long ago, and large numbers of irrigation cs were made in Iraq to irrigate the land. The Romans were great dam-builders and there was also a famous dam at Ma'rubin Arabia. The first paragraph mainly talks about ______.

A.
the problems caused by river water
B.
the necessity to irrigate the field
C.
the water shortage in some countries
D.
the cs carrying water to fields
题目标签:大坝混凝土运河
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
收藏 - 刷刷题收藏
举报
刷刷题
参考答案:
举一反三

【单选题】It __________ eight years to build the Dam(大坝) from 1998 t0 2006.A.spends B.costs C

A.
4.It __________ eight years to build the Dam(大坝) from 1998 t0 2006. A.spends
B.
costs
C.
paid
D.
took

【多选题】钢筋混凝土的缺点有()。

A.
工期长
B.
可模性差
C.
取材不便
D.
现浇结构模板用量大
E.
抗裂性能差

【多选题】大坝定检报告的附件包括()

A.
重要函件公文
B.
收集的现场资料与试验数据
C.
专题论证
D.
咨询报告
相关题目:
【单选题】It __________ eight years to build the Dam(大坝) from 1998 t0 2006.A.spends B.costs C
A.
4.It __________ eight years to build the Dam(大坝) from 1998 t0 2006. A.spends
B.
costs
C.
paid
D.
took
【多选题】钢筋混凝土的缺点有()。
A.
工期长
B.
可模性差
C.
取材不便
D.
现浇结构模板用量大
E.
抗裂性能差
【多选题】大坝定检报告的附件包括()
A.
重要函件公文
B.
收集的现场资料与试验数据
C.
专题论证
D.
咨询报告
刷刷题-刷题-导入试题 - 刷刷题
参考解析:
题目纠错 0
发布
刷刷题-刷题-导入试题 - 刷刷题刷刷题-刷题-导入试题 - 刷刷题刷刷题-刷题-导入试题 - 刷刷题
刷刷题-刷题-导入试题 - 刷刷题
刷刷题-刷题-导入试题 - 刷刷题
刷刷题-单词鸭