【单选题】

When are key project constraints documented?

A.
During definition activity
B.
During planning
C.
During initiation
D.
At the kick-off meeting
手机使用
分享
复制链接
新浪微博
分享QQ
微信扫一扫
微信内点击右上角“…”即可分享
反馈
收藏 - 刷刷题收藏
举报
刷刷题
参考答案:
举一反三

【单选题】A project is completed, however, the project was delayed, causing cost overruns at the end of the project.What should the project manager do in this case?

A.
Document the circumstances as lessons learned
B.
Focus attrition on archiving the financial records for this project
C.
Evaluate at the work of the project and compare the results to the project scope
D.
Document the circumstances surrounding project completion during the validate scope process.

【单选题】Which of the following is correct for the WBS?

A.
Work component descriptions are often collected in a WBS dictionary.
B.
WBS is the input of defining scope.
C.
The lowest level of WBS is work packages and cannot be further decomposed.
D.
The work not being included in WBS may not be outside the scope of the project.

【单选题】How should a project manager interpret an 8-point run in a process with 1 point located out of control limit?

A.
It is a normal situation, nothing should be done.
B.
Control limits should be widened.
C.
It is an abnormal situation; production processes should be corrected.
D.
It is a warning signal; quality measurement systems should be updated.

【单选题】Which evaluation technique is used as an essential planning component of controlling Schedule ?

A.
Schedule management plan
B.
Estimate at Completion (EAC)
C.
Actual Cost of Work Performed (ACWP)
D.
Variance analysis

【单选题】Of the options below, what is the most significant action the project manager will take for a virtual team project?

A.
Send a project plan to all members.
B.
Develop a communication management plan.
C.
Obtain and analyze team members’ expectations.
D.
Review the team members’ skill.
相关题目:
【单选题】A project is completed, however, the project was delayed, causing cost overruns at the end of the project.What should the project manager do in this case?
A.
Document the circumstances as lessons learned
B.
Focus attrition on archiving the financial records for this project
C.
Evaluate at the work of the project and compare the results to the project scope
D.
Document the circumstances surrounding project completion during the validate scope process.
【单选题】Which of the following is correct for the WBS?
A.
Work component descriptions are often collected in a WBS dictionary.
B.
WBS is the input of defining scope.
C.
The lowest level of WBS is work packages and cannot be further decomposed.
D.
The work not being included in WBS may not be outside the scope of the project.
【单选题】How should a project manager interpret an 8-point run in a process with 1 point located out of control limit?
A.
It is a normal situation, nothing should be done.
B.
Control limits should be widened.
C.
It is an abnormal situation; production processes should be corrected.
D.
It is a warning signal; quality measurement systems should be updated.
【单选题】Which evaluation technique is used as an essential planning component of controlling Schedule ?
A.
Schedule management plan
B.
Estimate at Completion (EAC)
C.
Actual Cost of Work Performed (ACWP)
D.
Variance analysis
【单选题】Of the options below, what is the most significant action the project manager will take for a virtual team project?
A.
Send a project plan to all members.
B.
Develop a communication management plan.
C.
Obtain and analyze team members’ expectations.